MidAmerican Energy

Before You Begin

  • Address and/or lot number shall be clearly posted at property.
  • Gas riser/meter bracket and/or electric meter socket shall be installed where applicable.
  • Meter site ground shall be backfilled and properly compacted to prevent settling.
  • Ground shall be within 4” of final grade where the gas/electric facilities are to be installed.
  • All material and obstructions shall be removed from the route/area where the gas/electric facilities are to be installed.
  • Privately owned underground facilities and systems shall be located and marked.

You will receive a confirmation email when the order is scheduled. The email will include any access requirements, order date and other important information. Please read the confirmation carefully.


New or Existing Building options
Building Type
Residence Type






House Number
Prefix
Street Name
Street Suffix
Suffix
Unit

Individual or company options




Want to be notified options

Want to be notified options



Can't find what you're looking for?